SUTERA PINES @ SUNGAI LONG - Kajang - Civil & Structural
activeSubmission deadline
20/11/2026 16:00
Site visit
Not scheduled
Contract duration
2 year
No site visit time has been set. Propose a date and time and the property manager will be notified.
Tender details
- Reference No.
- 0393/2019
- Category
- Civil & Structural
- Location
- Kajang, Selangor, Malaysia
- Site visit
- Not scheduled
Summary
SUTERA PINES @ SUNGAI LONG - Kajang - Civil & Structural (Civil & Structural) in Kajang, Selangor, Malaysia. Contract duration: 2 year. Scope of work includes Section 1. Contractors can request the full Bill of Quantities and submit a quote via Three Quotes.
Tender notes
Tender Evaluation • Completeness of tender submission: Required evaluation criterion • Lowest tender price acceptance: The lowest tender price shall not automatically constitute acceptance of the tender. • Clarification: The JMB may seek clarification from tenderers where necessary. Contact Details • Telephone: 03 – 8733 1737 • Email: suterapines.management@gmail.com • Management Office Address: Level 2, Block A, Jalan Sutera Pines, Sutera Pines, 43000 Kajang, Selangor Tender Conditions • Site inspection requirement: The tenderer shall be deemed to have inspected and understood the site conditions before submitting the tender. • Tender price inclusions: The tender price shall include all labour, materials, equipment, transportation, access arrangements, safety measures, protection, disposal and other costs necessary to complete the works. • Price validity: All prices shall remain valid for the tender validity period stated by the tenderer. • JMB right to accept or reject: The JMB reserves the right to accept or reject any tender, in whole or in part. • JMB right to request clarification: The JMB reserves the right to request clarification or additional supporting documents. • Lowest tender obligation: The JMB is not obliged to accept the lowest tender. • Shortlisting for negotiation: The JMB is shortlist tenderers for further clarification or negotiation where considered necessary. • Work commencement: No work shall commence until the contractor receives the appropriate written appointment, Letter of Award or Work Order from the JMB. • Variation and additional work: No variation or additional work shall be undertaken without prior written approval. Project Details • Client Name: JMB Kondominium Sutera Pines (Registration No. 0393/2019) • Project Description: Proposed Rectification Works to Rooftop Concrete Coping and Aluminium Capping at Block A • Site Location: Kondominium Sutera Pines, Jalan Sutera Pines, 43000 Kajang, Selangor Submission Instructions • Closing Date: Friday, 20 November 2026 • Closing Time: 4:00 PM • Late Submission Policy: Late submissions will not be accepted Technical Proposal • Required Submission: Proposed repair methodology • Required Submission: Proposed materials and product specifications • Required Submission: Proposed access method, including scaffolding or rope access, where applicable • Required Submission: Proposed work sequence • Required Submission: Safety and working-at-height procedures • Required Submission: Proposed manpower and supervision arrangements • Required Submission: Estimated completion programme • Required Submission: Proposed warranty and Defects Liability Period (DLP) Commercial Proposal • Required Submission: Completed and priced Bill of Quantities (BQ) • Required Submission: Unit rates and lump sum rates • Required Submission: Provisional item rates • Required Submission: SST, if applicable • Required Submission: Total tender sum • Required Submission: Proposed payment terms Site Inspection • Compulsory Attendance: Strongly encouraged but not compulsory • Site Conditions to Verify: Existing site conditions and extent of damage • Site Conditions to Verify: Access limitations and height of affected areas • Site Conditions to Verify: Requirements for scaffolding, rope access or other working platforms • Site Conditions to Verify: Working hours and site restrictions • Site Inspection Disclaimer: Failure to inspect the site shall not generally be accepted as grounds for additional claims arising from conditions that could reasonably have been identified during the site inspection Safety Requirements • Contractor Responsibility: The contractor shall be fully responsible for the safety of its workers, subcontractors and the public within the work area • Safety Focus Areas: Rope access/abseiling • Safety Focus Areas: Scaffolding and working platforms • Safety Focus Areas: Falling objects and debris protection • Safety Focus Areas: Barricading and warning signage • Safety Focus Areas: Personal protective equipment (PPE) • Safety Focus Areas: Tools and equipment • Safety Focus Areas: Protection of residents and vehicles • Safety Focus Areas: Emergency access • Safety Focus Areas: Proper disposal of construction materials • Compliance: All applicable occupational safety, construction and statutory requirements shall be complied with Project Details • Project Name: SUTERA PINES @ SUNGAI LONG • Client/Organisation: JMB KONDOMINIUM SUTERA PINES (NO. SIRI: 0393/2019) Site Inspection • Site Conditions to Verify: Safety requirements and protective arrangements • Site Conditions to Verify: Protection of residents, vehicles and common property • Site Conditions to Verify: Other conditions that may affect the execution of the works Scope of Works • Waterproofing Treatment: Apply suitable waterproofing treatment to the repaired rooftop coping, where required • Joint and Crack Sealing: Seal all joints, cracks and interfaces to prevent water penetration • Finishes Reinstatement: Reinstate affected finishes and apply suitable protective coatings • Quality Assurance: Ensure all completed surfaces are neat, uniform and free from visible defects Completion and Handover • Debris Removal: Remove all construction debris, surplus materials and temporary protection upon completion • Joint Inspection: Conduct a joint inspection with the Management Office • Defect Rectification: Rectify any defects identified during the inspection • Photographic Documentation: Submit photographs documenting the condition before, during, and after the rectification works • Documentation Submission: Provide relevant product specifications, material warranties, and completion reports • Final Handover: Hand over the completed works to the Management Office in satisfactory condition Tender Requirements • Company Experience: Company profile and relevant experience in concrete repair, structural rectification and building maintenance works • CIDB Registration: Valid CIDB registration and relevant category/grade, where applicable • Work Methodology: Proposed work methodology and material specifications • Work Schedule: Proposed work schedule and estimated completion period • Manpower and Equipment: Details of manpower, equipment and working-at-height arrangements • Insurance and Safety: Relevant insurance coverage and safety documentation • Warranty Period: Proposed warranty period for the completed rectification works • Project References: List of similar projects completed within the past three (3) years, including relevant project references Tenderer's Submission Requirements – Company Information • Company Registration: Company name and registration details • SSM Registration: SSM registration documents • Authorised Representative Contact: Contact details of authorised representative Tenderer's Submission Requirements – Relevant Experience • Similar Projects: Details of similar external concrete repair, facade, waterproofing, crack repair or high-rise building maintenance projects undertaken within the past three (3) years • Project Name and Location: Project name and location • Year Completed: Year completed • Contract Value: Contract value • Scope of Works: Scope of works • Client/Reference Contact: Client/reference contact, where available Project Information • Registration Number: 0393/2019 A. Preliminary and Safety Works • Detailed site inspection requirement: Conduct a detailed site inspection and assess the extent of the damaged rooftop coping and aluminium capping • Supply and access: Provide all necessary labour, materials, tools, machinery, equipment and access arrangements • Safety measures: Install appropriate barricades, warning signs, safety nets and protective measures to prevent falling debris and ensure public safety • Submission requirements: Submit the proposed work methodology, risk assessment and work schedule for the Management's review prior to commencement • Working-at-height compliance: Provide suitable working-at-height equipment and comply with all applicable occupational safety and health requirements B. Removal of Damaged Concrete • Concrete removal procedure: Carefully hack and remove all loose, cracked, and delaminated concrete along the affected rooftop coping • Defective material removal standard: Remove defective materials until sound and stable concrete is exposed • Debris management: Collect, transport and dispose of all construction debris at approved disposal facilities • Protection of adjacent structures: Protect adjacent structures, existing building finishes and common property during the works C. Concrete and Structural Rectification • Inspection of exposed surfaces: Inspect the exposed concrete surfaces and reinforcement bars following the removal of defective concrete • Reinforcement bar treatment: Clean and apply suitable anti-corrosion treatment to exposed reinforcement bars, where applicable • Reinforcement bar replacement condition: Replace or supplement severely deteriorated reinforcement bars, where necessary and subject to the recommendations and approval of the appointed Professional Engineer (PE) • Bonding agent requirement: Apply suitable bonding agents and approved structural repair mortar or equivalent materials • Coping reinstatement: Reinstate the concrete coping to its original profile, dimensions and alignment • Crack repair procedure: Repair identified cracks using appropriate repair methods recommended by the PE • Curing and finishing: Carry out proper curing and finishing to all repaired concrete surfaces D. Aluminium Capping Rectification • Existing capping rail handling: Carefully remove, realign or replace the existing damaged or dislodged aluminium capping rail, as necessary • New capping installation: Supply and install new aluminium capping sections, brackets, connectors and accessories where required • Alignment and fixing: Ensure proper alignment, secure fixing and anchorage of the aluminium capping • Joint sealing: Seal all joints and connections using suitable weather-resistant sealant • Final installation protection: Ensure the completed installation is securely fixed and adequately protected against water penetration Contractor Requirements • Compliance with Laws and Regulations: The contractor shall comply with all applicable laws, regulations, safety requirements and condominium rules. • Liability for Damage: The contractor shall be responsible for damage caused to common property or private property arising from its works. • Housekeeping: The contractor shall maintain proper housekeeping throughout the works. • Insurance Coverage: The contractor shall provide appropriate insurance coverage and supporting documents before commencement. Approval Process • Final Appointment Approval: The final appointment remains subject to the JMB's approval and applicable procurement/approval procedures. Site Inspection • Arrangement: By appointment with the Management Office Notice Date • Issue Date: 2026-11-02 Scope of Works • Defect 1: Severe cracking and delamination of the concrete coping along the rooftop edge • Defect 2: Dislodgement and misalignment of the existing aluminium capping rail • Defect 3: Deep cracks and deterioration of concrete, with potential exposure of internal reinforcement bars • Defect 4: Potential water ingress and further deterioration of the concrete structure • Defect 5: Potential falling debris, which may pose a safety risk to residents and the public Tender Requirements • Site Inspection Requirement: Tenderers are required to conduct a site inspection and familiarise themselves with the actual site conditions, extent of defects and accessibility requirements before submitting their tenders Tender Details • Tender Type: Open Tender • Closing Date and Time: Friday, 20th November 2026 @ 4:00 pm Scope of Works • Work Scope Description: Inspection, assessment, preparation, removal of defective materials, repair, reinstatement, finishing and all related access, safety and protection arrangements necessary to complete the works satisfactorily Tender Requirements • Eligibility Requirement: Suitably qualified and experienced contractors • Tender Opening Date: 02nd November 2026 Materials And Workmanship • Substrate Preparation Requirement: Contractor shall ensure proper preparation of the substrate before applying repair materials • Unacceptable Practice: Superficial filling or painting over cracks without proper preparation and rectification shall not be considered acceptable workmanship Professional Engineer's Assessment • Structural Damage Protocol: Contractor shall facilitate inspection and coordinate with JMB's appointed Professional Engineer (PE) • Structural Repair Approval: Contractor shall not proceed with any structural repair or strengthening works without necessary technical review and written approval • Additional Works Process: Any additional structural works identified during hacking and inspection shall be separately quantified and submitted for JMB's consideration and approval Defect Liability / Warranty • Minimum Defects Liability Period: Twelve (12) months from the date of practical completion • Defect Rectification: During DLP, contractor shall rectify defects attributable to poor workmanship, defective materials or improper application at no additional cost to the JMB • Manufacturer's Warranty Submission: Any manufacturer's warranty for waterproofing systems, repair materials and aluminium capping shall be submitted together with tender proposal, where applicable Variation / Additional Works • Prior Approval Requirement: No additional works, variation works or additional expenditure shall be carried out without JMB's prior written approval • Required Submission Details for Additional Works: Description of proposed works, reason for works, quantity involved, additional cost, and supporting photographs or technical information • JMB Right of Assessment: JMB reserves the right to obtain further quotations or assess the proposed variation before approving Materials And Workmanship • Suitable for external application: All materials shall be suitable for external application • Of acceptable commercial quality: All materials shall be of acceptable commercial quality • Compatible with existing substrate: All materials shall be compatible with the existing substrate • Applied in accordance with manufacturer's recommendations: All materials shall be applied in accordance with the manufacturer's recommendations • Subject to JMB/Management Office review and acceptance: All materials shall be subject to the JMB/Management Office's review and acceptance Professional Engineer's Assessment • Proposed structural repair methodology assessment: The proposed structural repair methodology, including reinforcement treatment, replacement or strengthening, shall be subject to the PE's assessment and recommendations Defect Liability / Warranty • Defects Liability Period statement requirement: Tenderers shall clearly state their proposed Defects Liability Period (DLP) and workmanship warranty Variation / Additional Works • Required submission details - Description of proposed additional works: Description of the proposed additional works • Required submission details - Reason for additional works: Reason for the additional works • Required submission details - Quantity of works involved: Quantity of works involved • Required submission details - Supporting photographs or technical information: Supporting photographs or technical information, where appropriate
Bill of Quantities
| Item | Description | Quantity | Unit | Notes |
|---|---|---|---|---|
| A | Section 1 Preliminary and Safety Works | 1 | lump sum | Includes: detailed site inspection and damage assessment of rooftop coping and aluminium capping | Location: Rooftop |
| B | Section 1 Removal of Damaged Concrete | 1 | lump sum | Includes: Hacking and removal of loose, cracked and delaminated concrete along affected rooftop coping | Location: Rooftop |
| C | Section 1 Concrete and Structural Rectification | 1 | lump sum | Includes: Inspection of exposed concrete surfaces and reinforcement bars | Location: Rooftop |
| D | Section 1 Aluminium Capping Rectification | 1 | lump sum | Includes: Careful removal, realignment or replacement of damaged or dislodged aluminium capping rail | Location: Rooftop |
| E | Section 1 Waterproofing and Finishing Works | 1 | lump sum | — |
| F | Section 1 Completion and Handover | 1 | lump sum | — |
Tender documents
Is This Your Tender?
Take ownership to manage this tender and review contractor responses.
Own This Tender NowQuestions & answers
Sign in to askOnly contractors invited to this tender can post in these threads, and everyone is shown anonymously.
No questions yet.