SUTERA PINES @ SUNGAI LONG - Kajang - Civil & Structural

active
Civil & StructuralKajang, Selangor, Malaysia

Submission deadline

20/11/2026 16:00

Site visit

Not scheduled

Contract duration

2 year

Site visit· 0 attendees signed up

No site visit time has been set. Propose a date and time and the property manager will be notified.

Tender details

Reference No.
0393/2019
Category
Civil & Structural
Location
Kajang, Selangor, Malaysia
Site visit
Not scheduled

Summary

SUTERA PINES @ SUNGAI LONG - Kajang - Civil & Structural (Civil & Structural) in Kajang, Selangor, Malaysia. Contract duration: 2 year. Scope of work includes Section 1. Contractors can request the full Bill of Quantities and submit a quote via Three Quotes.

Tender notes

Tender Evaluation • Completeness of tender submission: Required evaluation criterion • Lowest tender price acceptance: The lowest tender price shall not automatically constitute acceptance of the tender. • Clarification: The JMB may seek clarification from tenderers where necessary. Contact Details • Telephone: 03 – 8733 1737 • Email: suterapines.management@gmail.com • Management Office Address: Level 2, Block A, Jalan Sutera Pines, Sutera Pines, 43000 Kajang, Selangor Tender Conditions • Site inspection requirement: The tenderer shall be deemed to have inspected and understood the site conditions before submitting the tender. • Tender price inclusions: The tender price shall include all labour, materials, equipment, transportation, access arrangements, safety measures, protection, disposal and other costs necessary to complete the works. • Price validity: All prices shall remain valid for the tender validity period stated by the tenderer. • JMB right to accept or reject: The JMB reserves the right to accept or reject any tender, in whole or in part. • JMB right to request clarification: The JMB reserves the right to request clarification or additional supporting documents. • Lowest tender obligation: The JMB is not obliged to accept the lowest tender. • Shortlisting for negotiation: The JMB is shortlist tenderers for further clarification or negotiation where considered necessary. • Work commencement: No work shall commence until the contractor receives the appropriate written appointment, Letter of Award or Work Order from the JMB. • Variation and additional work: No variation or additional work shall be undertaken without prior written approval. Project Details • Client Name: JMB Kondominium Sutera Pines (Registration No. 0393/2019) • Project Description: Proposed Rectification Works to Rooftop Concrete Coping and Aluminium Capping at Block A • Site Location: Kondominium Sutera Pines, Jalan Sutera Pines, 43000 Kajang, Selangor Submission Instructions • Closing Date: Friday, 20 November 2026 • Closing Time: 4:00 PM • Late Submission Policy: Late submissions will not be accepted Technical Proposal • Required Submission: Proposed repair methodology • Required Submission: Proposed materials and product specifications • Required Submission: Proposed access method, including scaffolding or rope access, where applicable • Required Submission: Proposed work sequence • Required Submission: Safety and working-at-height procedures • Required Submission: Proposed manpower and supervision arrangements • Required Submission: Estimated completion programme • Required Submission: Proposed warranty and Defects Liability Period (DLP) Commercial Proposal • Required Submission: Completed and priced Bill of Quantities (BQ) • Required Submission: Unit rates and lump sum rates • Required Submission: Provisional item rates • Required Submission: SST, if applicable • Required Submission: Total tender sum • Required Submission: Proposed payment terms Site Inspection • Compulsory Attendance: Strongly encouraged but not compulsory • Site Conditions to Verify: Existing site conditions and extent of damage • Site Conditions to Verify: Access limitations and height of affected areas • Site Conditions to Verify: Requirements for scaffolding, rope access or other working platforms • Site Conditions to Verify: Working hours and site restrictions • Site Inspection Disclaimer: Failure to inspect the site shall not generally be accepted as grounds for additional claims arising from conditions that could reasonably have been identified during the site inspection Safety Requirements • Contractor Responsibility: The contractor shall be fully responsible for the safety of its workers, subcontractors and the public within the work area • Safety Focus Areas: Rope access/abseiling • Safety Focus Areas: Scaffolding and working platforms • Safety Focus Areas: Falling objects and debris protection • Safety Focus Areas: Barricading and warning signage • Safety Focus Areas: Personal protective equipment (PPE) • Safety Focus Areas: Tools and equipment • Safety Focus Areas: Protection of residents and vehicles • Safety Focus Areas: Emergency access • Safety Focus Areas: Proper disposal of construction materials • Compliance: All applicable occupational safety, construction and statutory requirements shall be complied with Project Details • Project Name: SUTERA PINES @ SUNGAI LONG • Client/Organisation: JMB KONDOMINIUM SUTERA PINES (NO. SIRI: 0393/2019) Site Inspection • Site Conditions to Verify: Safety requirements and protective arrangements • Site Conditions to Verify: Protection of residents, vehicles and common property • Site Conditions to Verify: Other conditions that may affect the execution of the works Scope of Works • Waterproofing Treatment: Apply suitable waterproofing treatment to the repaired rooftop coping, where required • Joint and Crack Sealing: Seal all joints, cracks and interfaces to prevent water penetration • Finishes Reinstatement: Reinstate affected finishes and apply suitable protective coatings • Quality Assurance: Ensure all completed surfaces are neat, uniform and free from visible defects Completion and Handover • Debris Removal: Remove all construction debris, surplus materials and temporary protection upon completion • Joint Inspection: Conduct a joint inspection with the Management Office • Defect Rectification: Rectify any defects identified during the inspection • Photographic Documentation: Submit photographs documenting the condition before, during, and after the rectification works • Documentation Submission: Provide relevant product specifications, material warranties, and completion reports • Final Handover: Hand over the completed works to the Management Office in satisfactory condition Tender Requirements • Company Experience: Company profile and relevant experience in concrete repair, structural rectification and building maintenance works • CIDB Registration: Valid CIDB registration and relevant category/grade, where applicable • Work Methodology: Proposed work methodology and material specifications • Work Schedule: Proposed work schedule and estimated completion period • Manpower and Equipment: Details of manpower, equipment and working-at-height arrangements • Insurance and Safety: Relevant insurance coverage and safety documentation • Warranty Period: Proposed warranty period for the completed rectification works • Project References: List of similar projects completed within the past three (3) years, including relevant project references Tenderer's Submission Requirements – Company Information • Company Registration: Company name and registration details • SSM Registration: SSM registration documents • Authorised Representative Contact: Contact details of authorised representative Tenderer's Submission Requirements – Relevant Experience • Similar Projects: Details of similar external concrete repair, facade, waterproofing, crack repair or high-rise building maintenance projects undertaken within the past three (3) years • Project Name and Location: Project name and location • Year Completed: Year completed • Contract Value: Contract value • Scope of Works: Scope of works • Client/Reference Contact: Client/reference contact, where available Project Information • Registration Number: 0393/2019 A. Preliminary and Safety Works • Detailed site inspection requirement: Conduct a detailed site inspection and assess the extent of the damaged rooftop coping and aluminium capping • Supply and access: Provide all necessary labour, materials, tools, machinery, equipment and access arrangements • Safety measures: Install appropriate barricades, warning signs, safety nets and protective measures to prevent falling debris and ensure public safety • Submission requirements: Submit the proposed work methodology, risk assessment and work schedule for the Management's review prior to commencement • Working-at-height compliance: Provide suitable working-at-height equipment and comply with all applicable occupational safety and health requirements B. Removal of Damaged Concrete • Concrete removal procedure: Carefully hack and remove all loose, cracked, and delaminated concrete along the affected rooftop coping • Defective material removal standard: Remove defective materials until sound and stable concrete is exposed • Debris management: Collect, transport and dispose of all construction debris at approved disposal facilities • Protection of adjacent structures: Protect adjacent structures, existing building finishes and common property during the works C. Concrete and Structural Rectification • Inspection of exposed surfaces: Inspect the exposed concrete surfaces and reinforcement bars following the removal of defective concrete • Reinforcement bar treatment: Clean and apply suitable anti-corrosion treatment to exposed reinforcement bars, where applicable • Reinforcement bar replacement condition: Replace or supplement severely deteriorated reinforcement bars, where necessary and subject to the recommendations and approval of the appointed Professional Engineer (PE) • Bonding agent requirement: Apply suitable bonding agents and approved structural repair mortar or equivalent materials • Coping reinstatement: Reinstate the concrete coping to its original profile, dimensions and alignment • Crack repair procedure: Repair identified cracks using appropriate repair methods recommended by the PE • Curing and finishing: Carry out proper curing and finishing to all repaired concrete surfaces D. Aluminium Capping Rectification • Existing capping rail handling: Carefully remove, realign or replace the existing damaged or dislodged aluminium capping rail, as necessary • New capping installation: Supply and install new aluminium capping sections, brackets, connectors and accessories where required • Alignment and fixing: Ensure proper alignment, secure fixing and anchorage of the aluminium capping • Joint sealing: Seal all joints and connections using suitable weather-resistant sealant • Final installation protection: Ensure the completed installation is securely fixed and adequately protected against water penetration Contractor Requirements • Compliance with Laws and Regulations: The contractor shall comply with all applicable laws, regulations, safety requirements and condominium rules. • Liability for Damage: The contractor shall be responsible for damage caused to common property or private property arising from its works. • Housekeeping: The contractor shall maintain proper housekeeping throughout the works. • Insurance Coverage: The contractor shall provide appropriate insurance coverage and supporting documents before commencement. Approval Process • Final Appointment Approval: The final appointment remains subject to the JMB's approval and applicable procurement/approval procedures. Site Inspection • Arrangement: By appointment with the Management Office Notice Date • Issue Date: 2026-11-02 Scope of Works • Defect 1: Severe cracking and delamination of the concrete coping along the rooftop edge • Defect 2: Dislodgement and misalignment of the existing aluminium capping rail • Defect 3: Deep cracks and deterioration of concrete, with potential exposure of internal reinforcement bars • Defect 4: Potential water ingress and further deterioration of the concrete structure • Defect 5: Potential falling debris, which may pose a safety risk to residents and the public Tender Requirements • Site Inspection Requirement: Tenderers are required to conduct a site inspection and familiarise themselves with the actual site conditions, extent of defects and accessibility requirements before submitting their tenders Tender Details • Tender Type: Open Tender • Closing Date and Time: Friday, 20th November 2026 @ 4:00 pm Scope of Works • Work Scope Description: Inspection, assessment, preparation, removal of defective materials, repair, reinstatement, finishing and all related access, safety and protection arrangements necessary to complete the works satisfactorily Tender Requirements • Eligibility Requirement: Suitably qualified and experienced contractors • Tender Opening Date: 02nd November 2026 Materials And Workmanship • Substrate Preparation Requirement: Contractor shall ensure proper preparation of the substrate before applying repair materials • Unacceptable Practice: Superficial filling or painting over cracks without proper preparation and rectification shall not be considered acceptable workmanship Professional Engineer's Assessment • Structural Damage Protocol: Contractor shall facilitate inspection and coordinate with JMB's appointed Professional Engineer (PE) • Structural Repair Approval: Contractor shall not proceed with any structural repair or strengthening works without necessary technical review and written approval • Additional Works Process: Any additional structural works identified during hacking and inspection shall be separately quantified and submitted for JMB's consideration and approval Defect Liability / Warranty • Minimum Defects Liability Period: Twelve (12) months from the date of practical completion • Defect Rectification: During DLP, contractor shall rectify defects attributable to poor workmanship, defective materials or improper application at no additional cost to the JMB • Manufacturer's Warranty Submission: Any manufacturer's warranty for waterproofing systems, repair materials and aluminium capping shall be submitted together with tender proposal, where applicable Variation / Additional Works • Prior Approval Requirement: No additional works, variation works or additional expenditure shall be carried out without JMB's prior written approval • Required Submission Details for Additional Works: Description of proposed works, reason for works, quantity involved, additional cost, and supporting photographs or technical information • JMB Right of Assessment: JMB reserves the right to obtain further quotations or assess the proposed variation before approving Materials And Workmanship • Suitable for external application: All materials shall be suitable for external application • Of acceptable commercial quality: All materials shall be of acceptable commercial quality • Compatible with existing substrate: All materials shall be compatible with the existing substrate • Applied in accordance with manufacturer's recommendations: All materials shall be applied in accordance with the manufacturer's recommendations • Subject to JMB/Management Office review and acceptance: All materials shall be subject to the JMB/Management Office's review and acceptance Professional Engineer's Assessment • Proposed structural repair methodology assessment: The proposed structural repair methodology, including reinforcement treatment, replacement or strengthening, shall be subject to the PE's assessment and recommendations Defect Liability / Warranty • Defects Liability Period statement requirement: Tenderers shall clearly state their proposed Defects Liability Period (DLP) and workmanship warranty Variation / Additional Works • Required submission details - Description of proposed additional works: Description of the proposed additional works • Required submission details - Reason for additional works: Reason for the additional works • Required submission details - Quantity of works involved: Quantity of works involved • Required submission details - Supporting photographs or technical information: Supporting photographs or technical information, where appropriate

Bill of Quantities

ItemDescriptionQuantityUnitNotes
A
Section 1
Preliminary and Safety Works
1lump sumIncludes: detailed site inspection and damage assessment of rooftop coping and aluminium capping | Location: Rooftop
B
Section 1
Removal of Damaged Concrete
1lump sumIncludes: Hacking and removal of loose, cracked and delaminated concrete along affected rooftop coping | Location: Rooftop
C
Section 1
Concrete and Structural Rectification
1lump sumIncludes: Inspection of exposed concrete surfaces and reinforcement bars | Location: Rooftop
D
Section 1
Aluminium Capping Rectification
1lump sumIncludes: Careful removal, realignment or replacement of damaged or dislodged aluminium capping rail | Location: Rooftop
E
Section 1
Waterproofing and Finishing Works
1lump sum—
F
Section 1
Completion and Handover
1lump sum—

Tender documents

Sutera Pines Roofing 1.jpg

JPG

Download

Sutera Pines Roofing 2.jpg

JPG

Download

Sutera Pines Roofing 3.jpg

JPG

Download

Sutera Pines Roofing 4.jpg

JPG

Download

Sutera Pines Roofing 5.jpg

JPG

Download

Sutera Pines Roofing 6.jpg

JPG

Download

Sutera Pines Roofing 7.jpg

JPG

Download

Contractor?

Sign in to see the full Bill of Quantities and submit a quote.

Quote for This Tender

Is This Your Tender?

Take ownership to manage this tender and review contractor responses.

Own This Tender Now

Questions & answers

Sign in to ask

Only contractors invited to this tender can post in these threads, and everyone is shown anonymously.

No questions yet.