JMB KONDOMINIUM SUTERA PINES - Kajang - Civil & Structural

active
Civil & StructuralKajang, Selangor, Malaysia

Submission deadline

20/11/2026 16:00

Site visit

Not scheduled

Contract duration

Required submission item

Site visit· 0 attendees signed up

No site visit time has been set. Propose a date and time and the property manager will be notified.

Tender details

Reference No.
0393/2019
Category
Civil & Structural
Location
Kajang, Selangor, Malaysia
Site visit
Not scheduled

Summary

JMB KONDOMINIUM SUTERA PINES - Kajang - Civil & Structural (Civil & Structural) in Kajang, Selangor, Malaysia. Contract duration: Required submission item. Scope of work includes Section 1. Contractors can request the full Bill of Quantities and submit a quote via Three Quotes.

Tender notes

Project Name: JMB KONDOMINIUM SUTERA PINES Project Location: Jalan Sutera Pines, Sutera Pines, 43000 Kajang, Selangor Contact Phone: 03 – 8733 1737 Technical Proposal • Proposed repair methodology: Required submission item Site Inspection • Site inspection requirement: Strongly encouraged but not compulsory; failure to inspect does not generally excuse claims from foreseeable site conditions • Existing site conditions and extent of damage: Tenderer must satisfy themselves as to this Safety Requirements • Contractor responsibility: Contractor shall be fully responsible for safety of workers, subcontractors and public within work area • Working at height: Particular attention required • Compliance obligation: All applicable occupational safety, construction and statutory requirements shall be complied with Contact Details • Email address: suterapines.management@gmail.com Tender Evaluation • Evaluation Criteria: Completeness of tender submission • Evaluation Criteria: Compliance with tender requirements • Evaluation Criteria: Technical suitability of proposed repair methodology • Evaluation Criteria: Relevant experience and track record • Evaluation Criteria: Contractor's resources and manpower • Evaluation Criteria: Safety arrangements • Evaluation Criteria: Quality and suitability of proposed materials • Evaluation Criteria: Proposed completion period • Evaluation Criteria: Warranty and DLP • Evaluation Criteria: Tender price and commercial terms • Evaluation Criteria: Overall suitability for the proposed works • Lowest Price Acceptance: The lowest tender price shall not automatically constitute acceptance of the tender • Clarification: The JMB may seek clarification from tenderers where necessary Tender Conditions • Site Inspection Requirement: The tenderer shall be deemed to have inspected and understood the site conditions before submitting the tender • Tender Price Scope: The tender price shall include all labour, materials, equipment, transportation, access arrangements, safety measures, protection, disposal and other costs necessary to complete the works • Price Validity: All prices shall remain valid for the tender validity period stated by the tenderer • JMB Right to Accept/Reject: The JMB reserves the right to accept or reject any tender, in whole or in part • JMB Right to Request Clarification: The JMB reserves the right to request clarification or additional supporting documents • Obligation to Accept Lowest Tender: The JMB is not obliged to accept the lowest tender • Shortlisting for Clarification: The JMB will shortlist tenderers for further clarification or negotiation where considered necessary • Commencement of Works: No work shall commence until the contractor receives the appropriate written appointment, Letter of Award or Work Order from the JMB • Variation and Additional Works: No variation or additional work shall be undertaken without prior written approval Submission of Tenders • Late Submissions: Late submissions will not be accepted Project Details • Project Name: Proposed Rectification Works to Rooftop Concrete Coping and Aluminium Capping at Block A Submission of Tenders • Closing Date and Time: Friday, 20 November 2026 @ 4:00 PM Tender Requirements • Company Experience: Relevant experience in concrete repair, structural rectification and building maintenance works • CIDB Registration: Valid CIDB registration and relevant category/grade, where applicable • Bill of Quantities: Completed and priced Bill of Quantities (BQ) • Work Schedule: Proposed work schedule and estimated completion period • Manpower and Equipment: Details of manpower, equipment and working-at-height arrangements • Insurance and Safety: Relevant insurance coverage and safety documentation • Warranty Period: Proposed warranty period for the completed rectification works • Similar Projects: List of similar projects completed within the past three (3) years, including relevant project references Tenderer's Submission Requirements - Relevant Experience • Project Experience Scope: Similar external concrete repair, facade, waterproofing, crack repair or high-rise building maintenance projects undertaken within the past three (3) years Waterproofing and Finishing Works • Waterproofing treatment: Apply suitable waterproofing treatment to the repaired rooftop coping, where required • Joint sealing: Seal all joints, cracks and interfaces to prevent water penetration • Finishes reinstatement: Reinstate affected finishes and apply suitable protective coatings • Surface quality: Ensure all completed surfaces are neat, uniform and free from visible defects Completion and Handover • Debris removal: Remove all construction debris, surplus materials and temporary protection upon completion • Joint inspection: Conduct a joint inspection with the Management Office • Defect rectification: Rectify any defects identified during the inspection • Documentation: Submit photographs documenting the condition before, during, and after the rectification works • Product documentation: Provide relevant product specifications, material warranties, and completion reports • Handover condition: Hand over the completed works to the Management Office in satisfactory condition Project Details • Registration Number: 0393/2019 Preliminary and Safety Works • Site Inspection Requirement: Conduct a detailed site inspection and assess the extent of the damaged rooftop coping and aluminium capping • Safety Measures: Install appropriate barricades, warning signs, safety nets and protective measures to prevent falling debris and ensure public safety • Work Methodology Submission: Submit the proposed work methodology, risk assessment and work schedule for the Management's review prior to commencement • Safety Compliance: Provide suitable working-at-height equipment and comply with all applicable occupational safety and health requirements Removal of Damaged Concrete • Concrete Removal: Carefully hack and remove all loose, cracked, and delaminated concrete along the affected rooftop coping • Debris Disposal: Collect, transport and dispose of all construction debris at approved disposal facilities • Property Protection: Protect adjacent structures, existing building finishes and common property during the works Concrete and Structural Rectification • Professional Engineer Approval: Subject to the recommendations and approval of the appointed Professional Engineer (PE) Aluminium Capping Rectification • Weather Sealing: Seal all joints and connections using suitable weather-resistant sealant Concrete and Structural Rectification • Reinforcement Bar Treatment: Clean and apply suitable anti-corrosion treatment to exposed reinforcement bars, where applicable • Bonding and Repair Mortar: Apply suitable bonding agents and approved structural repair mortar or equivalent materials • Concrete Coping Reinstatement: Reinstate the concrete coping to its original profile, dimensions and alignment • Crack Repair: Repair identified cracks using appropriate repair methods recommended by the PE • Curing and Finishing: Carry out proper curing and finishing to all repaired concrete surfaces • Concrete Surface Inspection: Inspect the exposed concrete surfaces and reinforcement bars following the removal of defective concrete Aluminium Capping Rectification • Removal and Realignment: Carefully remove, realign or replace the existing damaged or dislodged aluminium capping rail, as necessary • New Aluminium Capping Supply and Installation: Supply and install new aluminium capping sections, brackets, connectors and accessories where required • Alignment and Fixing: Ensure proper alignment, secure fixing and anchorage of the aluminium capping • Water Penetration Protection: Ensure the completed installation is securely fixed and adequately protected against water penetration Preliminary and Safety Works • Materials and Equipment Supply: Provide all necessary labour, materials, tools, machinery, equipment and access arrangements Removal of Damaged Concrete • Removal of Defective Materials: Remove defective materials until sound and stable concrete is exposed Contractor Requirements • Compliance with laws and regulations: The contractor shall comply with all applicable laws, regulations, safety requirements and condominium rules. • Liability for damage: The contractor shall be responsible for damage caused to common property or private property arising from its works. • Housekeeping: The contractor shall maintain proper housekeeping throughout the works. • Insurance requirement: The contractor shall provide appropriate insurance coverage and supporting documents before commencement. • Final approval: The final appointment remains subject to the JMB's approval and applicable procurement/approval procedures. Property Registration Number: No. Siri: 0393/2019 Project Location • Block: Block A Scope of Works • Inspection and assessment: Full inspection and assessment of defects • Preparation and removal: Preparation and removal of defective materials • Repair and reinstatement: Repair, reinstatement, and finishing of rooftop components • Access and safety: All related access, safety and protection arrangements Observed Defects • Concrete coping condition: Severe cracking and delamination of the concrete coping along the rooftop edge • Aluminium capping rail condition: Dislodgement and misalignment of the existing aluminium capping rail • Concrete deterioration and reinforcement exposure: Deep cracks and deterioration of concrete, with potential exposure of internal reinforcement bars • Water ingress risk: Potential water ingress and further deterioration of the concrete structure • Safety hazard: Potential falling debris, which may pose a safety risk to residents and the public Site Inspection • Compulsory Site Visit Required: Tenderers are required to conduct a site inspection and familiarise themselves with the actual site conditions, extent of defects and accessibility requirements before submitting their tenders • Appointment Method: By appointment with the Management Office Tender Instructions • Tender Notice Date: 02nd November 2026 • Recipient: All Owners / Tenants / Residents / Service Contractors • Tender Type: Open Tender • Tender Closing Date: Friday, 20th November 2026 • Tender Closing Time: 4:00 pm Materials And Workmanship • Material Quality Requirements: Suitable for external application, of acceptable commercial quality, compatible with existing substrate, applied per manufacturer's recommendations, subject to JMB/Management Office review and acceptance • Substrate Preparation: Contractor shall ensure proper preparation of substrate before applying repair materials • Unacceptable Practice: Superficial filling or painting over cracks without proper preparation and rectification shall not be considered acceptable workmanship Professional Engineer's Assessment • Structural Damage Inspection: Contractor shall facilitate inspection and coordinate with JMB's appointed Professional Engineer (PE) where structural damage is identified • Repair Methodology Approval: Proposed structural repair methodology including reinforcement treatment, replacement or strengthening shall be subject to PE's assessment and recommendations • Technical Approval Required: Contractor shall not proceed with any structural repair or strengthening works without necessary technical review and written approval • Additional Works Identification: Any additional structural works identified during hacking and inspection shall be separately quantified and submitted for JMB's consideration and approval Defect Liability / Warranty • DLP and Warranty Declaration: Tenderers shall clearly state their proposed Defects Liability Period (DLP) and workmanship warranty • Minimum Defects Liability Period: Twelve (12) months from the date of practical completion • Defect Rectification: During DLP, contractor shall rectify defects attributable to poor workmanship, defective materials or improper application at no additional cost to JMB • Manufacturer's Warranty Submission: Any manufacturer's warranty for waterproofing systems, repair materials and aluminium capping shall be submitted together with tender proposal, where applicable Variation / Additional Works • Prior Approval Requirement: No additional works, variation works or additional expenditure shall be carried out without JMB's prior written approval • Additional Works Submission Requirements: Description of proposed additional works; Reason for additional works; Quantity of works involved; Additional cost; Supporting photographs or technical information where appropriate • JMB Approval Process: JMB reserves the right to obtain further quotations or assess the proposed variation before approving

Bill of Quantities

ItemDescriptionQuantityUnitNotes
A
Section 1
Preliminary and Safety Works
1lump sumLocation: Rooftop coping
B
Section 1
Removal of Damaged Concrete
1lump sumLocation: Rooftop coping
C
Section 1
Concrete and Structural Rectification
1lump sumLocation: Rooftop coping
D
Section 1
Aluminium Capping Rectification
1lump sumLocation: Rooftop capping
E
Section 1
Waterproofing and Finishing Works
1lump sumRooftop
F
Section 1
Completion and Handover
1lump sumRooftop

Tender documents

Sutera Pines Roofing 1.jpg

JPG

Download

Sutera Pines Roofing 2.jpg

JPG

Download

Sutera Pines Roofing 3.jpg

JPG

Download

Sutera Pines Roofing 4.jpg

JPG

Download

Sutera Pines Roofing 5.jpg

JPG

Download

Sutera Pines Roofing 6.jpg

JPG

Download

Sutera Pines Roofing 7.jpg

JPG

Download

Contractor?

Sign in to see the full Bill of Quantities and submit a quote.

Quote for This Tender

Is This Your Tender?

Take ownership to manage this tender and review contractor responses.

Own This Tender Now

Questions & answers

Sign in to ask

Only contractors invited to this tender can post in these threads, and everyone is shown anonymously.

No questions yet.