JMB KONDOMINIUM SUTERA PINES - Kajang - Civil & Structural
activeSubmission deadline
20/11/2026 16:00
Site visit
Not scheduled
Contract duration
Required submission item
No site visit time has been set. Propose a date and time and the property manager will be notified.
Tender details
- Reference No.
- 0393/2019
- Category
- Civil & Structural
- Location
- Kajang, Selangor, Malaysia
- Site visit
- Not scheduled
Summary
JMB KONDOMINIUM SUTERA PINES - Kajang - Civil & Structural (Civil & Structural) in Kajang, Selangor, Malaysia. Contract duration: Required submission item. Scope of work includes Section 1. Contractors can request the full Bill of Quantities and submit a quote via Three Quotes.
Tender notes
Project Name: JMB KONDOMINIUM SUTERA PINES Project Location: Jalan Sutera Pines, Sutera Pines, 43000 Kajang, Selangor Contact Phone: 03 – 8733 1737 Technical Proposal • Proposed repair methodology: Required submission item Site Inspection • Site inspection requirement: Strongly encouraged but not compulsory; failure to inspect does not generally excuse claims from foreseeable site conditions • Existing site conditions and extent of damage: Tenderer must satisfy themselves as to this Safety Requirements • Contractor responsibility: Contractor shall be fully responsible for safety of workers, subcontractors and public within work area • Working at height: Particular attention required • Compliance obligation: All applicable occupational safety, construction and statutory requirements shall be complied with Contact Details • Email address: suterapines.management@gmail.com Tender Evaluation • Evaluation Criteria: Completeness of tender submission • Evaluation Criteria: Compliance with tender requirements • Evaluation Criteria: Technical suitability of proposed repair methodology • Evaluation Criteria: Relevant experience and track record • Evaluation Criteria: Contractor's resources and manpower • Evaluation Criteria: Safety arrangements • Evaluation Criteria: Quality and suitability of proposed materials • Evaluation Criteria: Proposed completion period • Evaluation Criteria: Warranty and DLP • Evaluation Criteria: Tender price and commercial terms • Evaluation Criteria: Overall suitability for the proposed works • Lowest Price Acceptance: The lowest tender price shall not automatically constitute acceptance of the tender • Clarification: The JMB may seek clarification from tenderers where necessary Tender Conditions • Site Inspection Requirement: The tenderer shall be deemed to have inspected and understood the site conditions before submitting the tender • Tender Price Scope: The tender price shall include all labour, materials, equipment, transportation, access arrangements, safety measures, protection, disposal and other costs necessary to complete the works • Price Validity: All prices shall remain valid for the tender validity period stated by the tenderer • JMB Right to Accept/Reject: The JMB reserves the right to accept or reject any tender, in whole or in part • JMB Right to Request Clarification: The JMB reserves the right to request clarification or additional supporting documents • Obligation to Accept Lowest Tender: The JMB is not obliged to accept the lowest tender • Shortlisting for Clarification: The JMB will shortlist tenderers for further clarification or negotiation where considered necessary • Commencement of Works: No work shall commence until the contractor receives the appropriate written appointment, Letter of Award or Work Order from the JMB • Variation and Additional Works: No variation or additional work shall be undertaken without prior written approval Submission of Tenders • Late Submissions: Late submissions will not be accepted Project Details • Project Name: Proposed Rectification Works to Rooftop Concrete Coping and Aluminium Capping at Block A Submission of Tenders • Closing Date and Time: Friday, 20 November 2026 @ 4:00 PM Tender Requirements • Company Experience: Relevant experience in concrete repair, structural rectification and building maintenance works • CIDB Registration: Valid CIDB registration and relevant category/grade, where applicable • Bill of Quantities: Completed and priced Bill of Quantities (BQ) • Work Schedule: Proposed work schedule and estimated completion period • Manpower and Equipment: Details of manpower, equipment and working-at-height arrangements • Insurance and Safety: Relevant insurance coverage and safety documentation • Warranty Period: Proposed warranty period for the completed rectification works • Similar Projects: List of similar projects completed within the past three (3) years, including relevant project references Tenderer's Submission Requirements - Relevant Experience • Project Experience Scope: Similar external concrete repair, facade, waterproofing, crack repair or high-rise building maintenance projects undertaken within the past three (3) years Waterproofing and Finishing Works • Waterproofing treatment: Apply suitable waterproofing treatment to the repaired rooftop coping, where required • Joint sealing: Seal all joints, cracks and interfaces to prevent water penetration • Finishes reinstatement: Reinstate affected finishes and apply suitable protective coatings • Surface quality: Ensure all completed surfaces are neat, uniform and free from visible defects Completion and Handover • Debris removal: Remove all construction debris, surplus materials and temporary protection upon completion • Joint inspection: Conduct a joint inspection with the Management Office • Defect rectification: Rectify any defects identified during the inspection • Documentation: Submit photographs documenting the condition before, during, and after the rectification works • Product documentation: Provide relevant product specifications, material warranties, and completion reports • Handover condition: Hand over the completed works to the Management Office in satisfactory condition Project Details • Registration Number: 0393/2019 Preliminary and Safety Works • Site Inspection Requirement: Conduct a detailed site inspection and assess the extent of the damaged rooftop coping and aluminium capping • Safety Measures: Install appropriate barricades, warning signs, safety nets and protective measures to prevent falling debris and ensure public safety • Work Methodology Submission: Submit the proposed work methodology, risk assessment and work schedule for the Management's review prior to commencement • Safety Compliance: Provide suitable working-at-height equipment and comply with all applicable occupational safety and health requirements Removal of Damaged Concrete • Concrete Removal: Carefully hack and remove all loose, cracked, and delaminated concrete along the affected rooftop coping • Debris Disposal: Collect, transport and dispose of all construction debris at approved disposal facilities • Property Protection: Protect adjacent structures, existing building finishes and common property during the works Concrete and Structural Rectification • Professional Engineer Approval: Subject to the recommendations and approval of the appointed Professional Engineer (PE) Aluminium Capping Rectification • Weather Sealing: Seal all joints and connections using suitable weather-resistant sealant Concrete and Structural Rectification • Reinforcement Bar Treatment: Clean and apply suitable anti-corrosion treatment to exposed reinforcement bars, where applicable • Bonding and Repair Mortar: Apply suitable bonding agents and approved structural repair mortar or equivalent materials • Concrete Coping Reinstatement: Reinstate the concrete coping to its original profile, dimensions and alignment • Crack Repair: Repair identified cracks using appropriate repair methods recommended by the PE • Curing and Finishing: Carry out proper curing and finishing to all repaired concrete surfaces • Concrete Surface Inspection: Inspect the exposed concrete surfaces and reinforcement bars following the removal of defective concrete Aluminium Capping Rectification • Removal and Realignment: Carefully remove, realign or replace the existing damaged or dislodged aluminium capping rail, as necessary • New Aluminium Capping Supply and Installation: Supply and install new aluminium capping sections, brackets, connectors and accessories where required • Alignment and Fixing: Ensure proper alignment, secure fixing and anchorage of the aluminium capping • Water Penetration Protection: Ensure the completed installation is securely fixed and adequately protected against water penetration Preliminary and Safety Works • Materials and Equipment Supply: Provide all necessary labour, materials, tools, machinery, equipment and access arrangements Removal of Damaged Concrete • Removal of Defective Materials: Remove defective materials until sound and stable concrete is exposed Contractor Requirements • Compliance with laws and regulations: The contractor shall comply with all applicable laws, regulations, safety requirements and condominium rules. • Liability for damage: The contractor shall be responsible for damage caused to common property or private property arising from its works. • Housekeeping: The contractor shall maintain proper housekeeping throughout the works. • Insurance requirement: The contractor shall provide appropriate insurance coverage and supporting documents before commencement. • Final approval: The final appointment remains subject to the JMB's approval and applicable procurement/approval procedures. Property Registration Number: No. Siri: 0393/2019 Project Location • Block: Block A Scope of Works • Inspection and assessment: Full inspection and assessment of defects • Preparation and removal: Preparation and removal of defective materials • Repair and reinstatement: Repair, reinstatement, and finishing of rooftop components • Access and safety: All related access, safety and protection arrangements Observed Defects • Concrete coping condition: Severe cracking and delamination of the concrete coping along the rooftop edge • Aluminium capping rail condition: Dislodgement and misalignment of the existing aluminium capping rail • Concrete deterioration and reinforcement exposure: Deep cracks and deterioration of concrete, with potential exposure of internal reinforcement bars • Water ingress risk: Potential water ingress and further deterioration of the concrete structure • Safety hazard: Potential falling debris, which may pose a safety risk to residents and the public Site Inspection • Compulsory Site Visit Required: Tenderers are required to conduct a site inspection and familiarise themselves with the actual site conditions, extent of defects and accessibility requirements before submitting their tenders • Appointment Method: By appointment with the Management Office Tender Instructions • Tender Notice Date: 02nd November 2026 • Recipient: All Owners / Tenants / Residents / Service Contractors • Tender Type: Open Tender • Tender Closing Date: Friday, 20th November 2026 • Tender Closing Time: 4:00 pm Materials And Workmanship • Material Quality Requirements: Suitable for external application, of acceptable commercial quality, compatible with existing substrate, applied per manufacturer's recommendations, subject to JMB/Management Office review and acceptance • Substrate Preparation: Contractor shall ensure proper preparation of substrate before applying repair materials • Unacceptable Practice: Superficial filling or painting over cracks without proper preparation and rectification shall not be considered acceptable workmanship Professional Engineer's Assessment • Structural Damage Inspection: Contractor shall facilitate inspection and coordinate with JMB's appointed Professional Engineer (PE) where structural damage is identified • Repair Methodology Approval: Proposed structural repair methodology including reinforcement treatment, replacement or strengthening shall be subject to PE's assessment and recommendations • Technical Approval Required: Contractor shall not proceed with any structural repair or strengthening works without necessary technical review and written approval • Additional Works Identification: Any additional structural works identified during hacking and inspection shall be separately quantified and submitted for JMB's consideration and approval Defect Liability / Warranty • DLP and Warranty Declaration: Tenderers shall clearly state their proposed Defects Liability Period (DLP) and workmanship warranty • Minimum Defects Liability Period: Twelve (12) months from the date of practical completion • Defect Rectification: During DLP, contractor shall rectify defects attributable to poor workmanship, defective materials or improper application at no additional cost to JMB • Manufacturer's Warranty Submission: Any manufacturer's warranty for waterproofing systems, repair materials and aluminium capping shall be submitted together with tender proposal, where applicable Variation / Additional Works • Prior Approval Requirement: No additional works, variation works or additional expenditure shall be carried out without JMB's prior written approval • Additional Works Submission Requirements: Description of proposed additional works; Reason for additional works; Quantity of works involved; Additional cost; Supporting photographs or technical information where appropriate • JMB Approval Process: JMB reserves the right to obtain further quotations or assess the proposed variation before approving
Bill of Quantities
| Item | Description | Quantity | Unit | Notes |
|---|---|---|---|---|
| A | Section 1 Preliminary and Safety Works | 1 | lump sum | Location: Rooftop coping |
| B | Section 1 Removal of Damaged Concrete | 1 | lump sum | Location: Rooftop coping |
| C | Section 1 Concrete and Structural Rectification | 1 | lump sum | Location: Rooftop coping |
| D | Section 1 Aluminium Capping Rectification | 1 | lump sum | Location: Rooftop capping |
| E | Section 1 Waterproofing and Finishing Works | 1 | lump sum | Rooftop |
| F | Section 1 Completion and Handover | 1 | lump sum | Rooftop |
Tender documents
Is This Your Tender?
Take ownership to manage this tender and review contractor responses.
Own This Tender NowQuestions & answers
Sign in to askOnly contractors invited to this tender can post in these threads, and everyone is shown anonymously.
No questions yet.